E+N Track Work
   Railfan.net Web Forums
   Regional Area Operations
   Vancouver Island
(Moderators: SRY 110, Pyronova, Henry)
   E+N Track Work
« Previous topic | Next topic »
Pages: 1 2 3 4 5 6 7  ReplyReply     EMail TopicEMail Topic   PrintPrint
   Author  Topic: E+N Track Work  (Read 6032 times)
MinionII
Historian
Posts: 528
Re: E+N Track Work
 
« Reply #120 on: Aug 27th, 2017, 11:43pm »
Quick-Jump   Reply w/Quote   Modify

Did the condition of the ties and roadbed take a nosedive north of that point?

Logged
CLC Fan

View Profile  

Posts: 557
Re: E+N Track Work
 
« Reply #121 on: Sep 1st, 2017, 2:53am »
Quick-Jump   Reply w/Quote   Modify

No.  It still has the same looks at least up to Green Lake trestle.  I've just never seen a demarcation so obvious like that.  Could be nothing, in which case  management at SR/VI is having a good chuckle at my expense. ☺

Logged
cycledude
Railfan
Posts: 210
Re: E+N Track Work
 
« Reply #122 on: Oct 5th, 2017, 9:42am »
Quick-Jump   Reply w/Quote   Modify

E&N Siding on FlickR
Perhaps someone knows why it was placed at this location
It is visible in Google.earth at: 4826'33.50"N 12325'44.86"W


Logged
railpuck
Railfan
View Profile  

Posts: 135
Re: E+N Track Work
 
« Reply #123 on: Oct 5th, 2017, 11:52am »
Quick-Jump   Reply w/Quote   Modify

on Aug 27th, 2017, 11:43pm, MinionII wrote:       (Click here for original message)
Did the condition of the ties and roadbed take a nosedive north of that point?

 
Its mostly bad ties that require replacement.


Logged
MinionII
Historian
Posts: 528
Re: E+N Track Work
 
« Reply #124 on: Oct 5th, 2017, 11:59pm »
Quick-Jump   Reply w/Quote   Modify

on Oct 5th, 2017, 9:42am, cycledude wrote:       (Click here for original message)
E&N Siding on FlickR
Perhaps someone knows why it was placed at this location
It is visible in Google.earth at: 4826'33.50"N 12325'44.86"W

 
That is the beginning of the spur that used to drop down into the shipyard. There are still rails in the ground in the shipyard, and the main walkway from the back gate off Maplebank down into the yard was the route of the spur. A little further south would have been the switch for Superior Propane, but that's long gone...the Wellness Center sits there now.


Logged
cycledude
Railfan
Posts: 210
Re: E+N Track Work
 
« Reply #125 on: Oct 11th, 2017, 9:27pm »
Quick-Jump   Reply w/Quote   Modify

Thanks for your reply
I'm not sure which shipyard that was but just the other day I photoed the back gate to the Dry Dock


Logged